Projects

Experience and expertise from Alice to Darwin and everywhere in between.

A detailed view of a pair of vintage, silver-rimmed spectacles resting on a rustic, weathered wooden surface.

Case Studies

Large white metal trusses span the outdoor courtyard of a building under a bright blue sky.
December 2, 2025
The project at Gillen Primary School in Alice Springs involved the supply, delivery, and installation of a steel shade structure in the central courtyard. It included environmental management, termite protection, site preparation with demolition and temporary fencing, block and concrete construction, and steel construction of trusses with shop drawings.
A white semi-truck drives over a cattle guard on a dusty red dirt road under a cloudy sky.
December 2, 2025
The scope of works for this project involved existing gates with cattle grids on Delmore Downs Road and Waite River Road.
An outdoor patio with a patterned, rusted-metal canopy providing shade over a curved pathway in a desert landscape.
December 2, 2025
The Akeyulerre Site Redevelopment at Lots 194 and 195 – 3 and 5 Stuart Terrace included provisions for steel construction, seating, and fencing, with specific details for various types of fencing (colorbond, spear bottom, FE01, and FE03), structural steel installation, and laser-cut sheets.
A textured, rust-colored metal bench with an abstract, organic-shaped backrest sits on a red dirt path in a wooded area.
December 2, 2025
The project at Watarrka National Park involved the fabrication and installation of two interpretive seats along Kings Creek Walk.
A modern black metal storage building with multiple roll-up doors, set against a cloudy sky and dirt ground.
August 28, 2025
This project involved the supply and installation services for an 8x36m gable roof shed, featuring a robust 125mm thick concrete slab with F82 mesh, 2 PA doors, and 6 large roller doors.

Specialty Projects

A white modular building with dark-screened windows and a small covered entry, set against a clear blue sky.
March 12, 2026
Building Better Schools (BBS) Program CLIENT : Department of Infrastrucutre, Planning and Logistics VALUE : $1.465M YEAR COMPLETE : 2023 Works comprise of the design, documentation and construction contract package off our school locations in remote regions surrounding Alice Springs. This project was completed under the management of Tim Young (Director/Operations Manager) This project was delivered within 3 weeks construction/onsite time period& there were no defects recorded. There were also no WorkSafe issues.
A row of white, corrugated metal outdoor toilet stalls with a mesh ventilation strip under a slanted metal roof.
By Chris Faulkner March 12, 2026
Building Better Schools (BBS) Program CLIENT : Department of Infrastrucutre, Planning and Logistics VALUE : $1.465M YEAR COMPLETE : 2023 Works comprise of the design, documentation and construction contract package off our school locations in remote regions surrounding Alice Springs. This project was completed under the management of Tim Young (Director/Operations Manager) This project was delivered within 3 weeks construction/onsite time period& there were no defects recorded. There were also no WorkSafe issues.
A colorful playground structure with a bright orange slide under a metal shade canopy on a wood-chipped ground.
By Brad Bellette March 12, 2026
Building Better Schools (BBS) Program CLIENT : Department of Infrastrucutre, Planning and Logistics VALUE : $1.465M YEAR COMPLETE : 2023 Works comprise of the design, documentation and construction contract package off our school locations in remote regions surrounding Alice Springs. This project was completed under the management of Tim Young (Director/Operations Manager) This project was delivered within 3 weeks construction/onsite time period& there were no defects recorded. There were also no WorkSafe issues.
A bright blue spiral slide on a playground with tan ground, surrounded by trees next to a building on a sunny day.
March 12, 2026
Building Better Schools (BBS) Program CLIENT : Department of Infrastrucutre, Planning and Logistics VALUE : $1.465M YEAR COMPLETE : 2023 Works comprise of the design, documentation and construction contract package off our school locations in remote regions surrounding Alice Springs. This project was completed under the management of Tim Young (Director/Operations Manager) This project was delivered within 3 weeks construction/onsite time period& there were no defects recorded. There were also no WorkSafe issues.
A solar panel shelter structure standing over a dirt lot next to a flagpole with a flying flag under a bright blue sky.
December 2, 2025
The scope for Willowra School included the construction of a new concrete basketball half court with a shade structure, following design drawings and lowering truss seating to 5000mm for better weather protection.